High Efficient,Reliable,Convenient---

MOBILE CRUSHER

  • Home
  • Knowledges
  • Vsi crusher for gold ore mining industry in South Africa

Vsi crusher for gold ore mining industry in South Africa

Ore crushing is iron ore, manganese ore, silver, gold, lead and zinc, bauxite, copper and other metal ore mining, crushing the entire processing system. Liming Heavy Industry(shanghai) ore vis crusher has a simple structure, low cost, Chairman; energy efficient, high crushing efficiency; crushing, coarse grinding function; was a cube, iron pollution; operation and maintenance, easy installation;, light weight, installation and diverse, mobile installation.

The maximum particle size and placer gold of the gold placer gangue minimum size of up to thousands of times, large pieces of gravel normally does not contain gold. After grading operations, it is possible to leave the metal-free boulders and gravel come in, thus greatly reducing the volume of the candidate materials. The consumption theory marked, placer gold beneficiation process, washing and grading is a very critical aspect. Washing net, a serious loss of metal clay destroyed sorting operation, resulting in recoveries rate and lower gold production. Bad grade mixed election, the thickness of the grain size, sorting results are not good. Should be the foundation of the spread rate of the system analysis of ore particle size composition and gold, separating the detailed status of each mine worked out really feasible washing, grading plans. Sand gravel extraction operations need to consume a certain amount of power. The power consumption of the unit weight of the material is the specification of the of certain equipment deflaking operating strength. The more viscous material is disposed, the more the power required. Gold placer based on the level of difficulty of the material gravel extraction and washing, usually can be divided into washable (including gravel – pebble) ore, ore (containing a small amount of clay) middle-washable and hard to wash muddy (including a large number of clay) ore.

Vsi crusher for gold ore mining industry in South Africa

Vsi crusher for gold ore mining industry in South Africa

VSI crusher handling large, high capacity 50-500t/h, compared with the same power of traditional equipment, production increased by 30% and stable. Low consumption of wearing parts – the best crushing chamber material impact angle design, less friction and wear parts, 30% lower operating costs than traditional equipment, directly reduce the cost of the use of equipment. Product shape – cubic shape, grain shape is good, with reasonable level, adjustable fineness modulus; particularly suitable for artificial sand and stone shaping, proved shaping effect increased by 30% than other traditional equipment sand.

Vsi crusher for gold ore mining industry in South Africa

Liming Heavy Industry(shanghai) is a global suppliers and manufacturers of crushing, grinding, sand making and beneficiation plant. We provide complete sets gold ore processing plant and crushing plant for sale such as jaw crusher, impact crusher, cone crusher, mobile crusher etc.Liming Heavy Industry(shanghai) vsi crusher is designed in compact and robust structure; it can deal any kinds of hard and abrasive stones. As a professional vsi crusher supplier, we developed mobile vsi crusher for flexible installation and application. It has been most favorite crushing machine for quarries, mining and construction industry. Our vsi crusher have been exported to many countries such as Algeria, India, South Africa, Russia, Indonesia, Zambia, Zimbabwe, Pakistan, Kenya, Guinea, Omen, Australia, Germany, Liberia, Angola, Philippines, America, Tanzania, Saudi Arabia, Malaysia , Nigeria, Turkey, Ghana etc. If you want to know vsi crusher price or other information, please contact us.

Now, you can OR to get price and product manual!

Other Crushing and Grinding Equipment

In order to recommend you the most suitable plant, you are kindly requested to tell us the below information:

1 what kind of stone do you want to crush?
2 what is the material size before crushing?
3 what is the final product size do you want?
4 what is the capacity you want tons per hour?
5 what will you do with the final products?